We’re on the verge of something exciting.

Introducing the Cumberland Sweep, a three-mile multimodal path designed to improve connectivity throughout the core of the Cumberland CID with dedicated walking and cycling lanes and an autonomous shuttle system that will make travel easier, more reliable, and safer.

In addition, a Pedestrian Bridge is planned across Cobb Parkway (U.S. 41), a high-volume, six-lane state route corridor, designed in partnership with the City of Smyrna to improve safety and walkability to Smyrna and to The Battery Atlanta.

Multi-modal path segment rendering